Point Hope Road Resurfacing (Phase I)
Customer: North Slope Borough
Location: Point Hope, AK
Completion Date: September 2024
Contract: $5.0M
Service: Civil
Project Highlights
In the first phase of a long-term transportation upgrade, our team resurfaced city roads throughout Point Hope to improve drivability and safety. The project delivered durable, community-enhancing infrastructure suited to Arctic wear and tear.
- Reclaimed and resurfaced 4.5 miles of city streets, featuring a 21-foot-wide roadbed, 2-inch-thick asphalt, and a 2% crown.
- Placed 6,135 tons of asphalt to improve long-term stability and performance.
- Paved 170 driveways and business access points.
- Graded and compacted gravel roads to enhance durability.
- Executed work during the short construction window of Arctic summer.